<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
  <title>Ministry of Power | IndusDesk</title>
  <link>https://indusdesk.com/ministry-of-power/insights/</link>
  <atom:link href="https://indusdesk.com/feed/ministry-of-power.xml" rel="self" type="application/rss+xml"/>
  <description>Ministry of Power: recent notices, each summarized and linked to the notice itself.</description>
  <language>en-us</language>
  <lastBuildDate>Tue, 29 Sep 2026 00:00:00 GMT</lastBuildDate>

  <item>
    <title>CAFE norms set for M1 passenger vehicles from April 2027</title>
    <link>https://indusdesk.com/ministry-of-power/insights/cafe-norms-set-for-m1-passenger-vehicles-from-april-2027/</link>
    <guid isPermaLink="false">https://indusdesk.com/insights/#2026-09-29-cafe-norms-set-for-m1-passenger-vehicles-from-april-2027</guid>
    <pubDate>Tue, 29 Sep 2026 00:00:00 GMT</pubDate>
    <category>Ministry of Power</category>
    <description>From April 1, 2027, each M1 vehicle manufacturer&apos;s average fuel consumption must not exceed a × (W − 1229) + c liters per 100 km, with a and c falling each year to 2031-2032. Credits can be traded or bought from BEE.</description>
  </item>

  <item>
    <title>Power sector cyber security rules bind vendors from April 2027</title>
    <link>https://indusdesk.com/ministry-of-power/insights/power-sector-cyber-security-rules-bind-vendors-from-april-2027/</link>
    <guid isPermaLink="false">https://indusdesk.com/insights/#2026-07-31-power-sector-cyber-security-rules-bind-vendors-from-april-2027</guid>
    <pubDate>Fri, 31 Jul 2026 00:00:00 GMT</pubDate>
    <category>Ministry of Power</category>
    <description>From April 1, 2027, power sector equipment and software vendors must supply recovery plans, signed or authenticated patches, hardened products and a bill of materials. Prosumer equipment data must stay in India.</description>
  </item>

  <item>
    <title>Mandatory star rating for induction hobs moves to January 1, 2027</title>
    <link>https://indusdesk.com/ministry-of-power/insights/mandatory-star-rating-for-induction-hobs-moves-to-january-1-2027/</link>
    <guid isPermaLink="false">https://indusdesk.com/insights/#2026-04-04-mandatory-star-rating-for-induction-hobs-moves-to-january-1-2027</guid>
    <pubDate>Sat, 04 Apr 2026 00:00:00 GMT</pubDate>
    <category>Ministry of Power</category>
    <description>Mandatory star rating for countertop induction hobs now starts January 1, 2027, not July 1, 2026. The star bands in S.O. 5665(E) are unchanged, and their validity still ends December 31, 2028.</description>
  </item>

</channel>
</rss>
