Electronics manufacturing schemes in India: PLI, ECMS and MPMS

The Ministry of Electronics and Information Technology (MeitY) runs several electronics manufacturing schemes. They include Production Linked Incentive (PLI) 2.0 for IT hardware, the Electronics Component Manufacturing Scheme (ECMS) and the Mobile Phone Manufacturing Scheme (MPMS). Two take applications on October 31, 2026: ECMS segment D until April 30, 2027, and MPMS Target Segment 1 until March 31, 2029.

Published and updated

Which electronics manufacturing schemes are open on October 31, 2026?

On October 31, 2026, the Electronics Component Manufacturing Scheme (ECMS) takes applications for supply chain and capital equipment, until April 30, 2027. The Mobile Phone Manufacturing Scheme (MPMS) takes them for Target Segment 1 until March 31, 2029. Semicon 2.0 takes them for fabs, packaging, and machines and materials. PLI 2.0 for IT hardware closed to applications in 2023.

Schemes and their windows, October 31, 2026
SchemeSupportsApplicationsEndsSource
PLI 2.0 for IT hardwareLaptops, tablets, all-in-one PCs, servers and ultra small form factor computers made in IndiaClosed August 30, 2023; MeitY may reopen it on the industry's responseMarch 31, 2031Notification (Production Linked Scheme 2.0 for IT Hardware notification 0 1, link 1 of 10), opens in a new tab, paras 6.2 and 6.3; extension, opens in a new tab, para 5
ECMS segments A, B, C and ESub-assemblies, bare components and optical transceivers made in IndiaClosed September 30, 2025Six years of turnover-linked incentiveAmendment-2, opens in a new tab, para 1; notification (e31d6fbd4044f8794f58157ba685e1ad, link 2 of 10), opens in a new tab, para 7.1
ECMS segment DSupply chain parts and capital equipment for electronics manufacturingOpen until April 30, 2027Investment within five years of acknowledgementECMS portal, opens in a new tab, notice 2; notification, para 7.4
MPMS Target Segment 1Mobile phones made in IndiaOpen October 15, 2026 to March 31, 2029End of 2030-31 (March 31, 2031)Guidelines (Mobile phone makers can apply for incentives from October 15, 2026-10-06, link 1 of 5), opens in a new tab, para 14.2; notification (0cad9c3d9d9bb4361151638fcb2394c8, link 3 of 10), opens in a new tab, para 6
Semicon 2.0Chip design, machines and materials, fabs, packaging, research and development (R&D), and talentThree years at first; for machines and materials, fabs and packaging, from September 16, 2026Projects preferably up to six yearsNotification (7a6e8695949c78a289790695b5302713), opens in a new tab, paras 3 to 5; guidelines (W-38/6/2025-IPHW, 2026-09-16), opens in a new tab, para 7.1

MeitY's other rules are on MeitY: India's data, platform, cyber security and electronics rules.

What did the PLI scheme for mobile phones deliver?

The PLI scheme for large scale electronics manufacturing, notified on April 1, 2020 for mobile phones and their components, drew ₹20,587 crore of investment against a ₹7,000 crore target, by the government's figures. It had paid ₹19,091 crore of incentives by March 2026, from an outlay of ₹34,139 crore, MeitY told the Lok Sabha on July 29, 2026.

Phone PLI targets and results, Lok Sabha answer of July 29, 2026
MeasureTarget over the scheme's tenureAchieved (government figures)
Investment₹7,000 crore₹20,587 crore (294%)
Sales or production₹8,12,550 crore₹11,61,581 crore (143%)
Exports₹4,87,530 crore₹6,53,745 crore (134%)
Incremental direct jobs2,00,000 jobs1,69,150 jobs (84%)

The same Lok Sabha answer, opens in a new tab puts domestic value addition in phones at about 23%, up from about 15%, over the scheme's tenure.

The Lok Sabha answer gives no end date for the scheme. For phones, the MPMS runs from 2026-27 to 2030-31 (MPMS notification, opens in a new tab, para 6).

What is PLI 2.0 for IT hardware, and can you still apply?

PLI 2.0 for IT hardware is MeitY's incentive scheme for laptops, tablets, all-in-one PCs, servers and ultra small form factor computers made in India, notified on May 29, 2023. You can't apply now: applications closed on August 30, 2023. MeitY may reopen the scheme during its tenure, which ends on March 31, 2031, based on the industry's response.

PLI 2.0 for IT hardware at a glance
ItemDetailSource
ProductsLaptops, tablets, all-in-one PCs, servers and ultra small form factor (USFF) computersNotification of May 29, 2023, opens in a new tab, para 4
IncentiveAbout 5% on average for items made in India: assembly and printed circuit board (PCB) assembly in year one, then at least one more component or sub-assembly a year, at falling ratesPara 3; Annexure B
Outlay₹16,939 crore of expected incentives over six years; the Cabinet approved a ₹17,000 crore budget on May 17, 2023Para 8.1; Cabinet release, opens in a new tab
Investment and ceilingGlobal company: ₹500 crore over six years, incentive capped at ₹4,500 crore. Hybrid: ₹250 crore and ₹2,250 crore. Domestic: ₹20 crore and ₹500 croreParas 5.2.1 and 8.2
Domestic companyMore than 50% beneficially owned by resident Indian citizens or Indian companies they ultimately own and controlAnnexure A, note 2
Contract manufacturingInvestment in contract manufacturing facilities counts as the applicant'sPara 5.2.2
Who may applyAny company registered in India, one application eachParas 10.1 and 5.1

A company that benefits from PLI 2.0 must use firmware for servers from Indian sources, or from other trusted foreign sources that MeitY certifies (notification (Production Linked Scheme 2.0 for IT Hardware notification 0 1, link 5 of 10), opens in a new tab, para 5.4).

MeitY's approved list, opens in a new tab names 27 companies under PLI 2.0. By June 30, 2026, the PLI schemes for IT hardware, counted together, had drawn ₹1,056 crore of investment (99% of the target to 2026-27) and ₹24,385 crore of sales or production (45%). They had paid ₹97.85 crore of incentives by June 2026, the government told the Lok Sabha on July 29, 2026 (Unstarred Question No. 1695, opens in a new tab).

What does ECMS support, and which windows are open?

The Electronics Component Manufacturing Scheme (ECMS), notified on April 8, 2025, pays incentives for making components in India. It covers display and camera modules, passive and electro-mechanical components, printed circuit boards, lithium-ion cells for digital devices, enclosures, optical transceivers, their supply chain and capital equipment. Only segment D, supply chain and capital equipment, still takes applications, until April 30, 2027.

ECMS at a glance
ItemDetailSource
Budget₹22,919 crore at notification, administrative expenses included; ₹40,000 crore after Budget 2026, by the government's answer of March 13, 2026Notification (e31d6fbd4044f8794f58157ba685e1ad, link 6 of 10), opens in a new tab, para 10; answer 2472, opens in a new tab
Jobs conditionOne point of the turnover-linked rate, and five of the 25 points of capital expenditure (capex) incentive, depend on the cumulative employment thresholdParas 6.1 and 6.2
WindowsA, B, C and E closed September 30, 2025; D open until April 30, 2027Amendment-2, opens in a new tab; portal, opens in a new tab
Who may applyA company registered in India under the Companies Act, 2013, or a limited liability partnership (LLP) registered in IndiaGuidelines (30e8672a53f05b9f90d86d16901b23d2, link 3 of 5), opens in a new tab, para 2.1
Contract manufacturingNot eligible; a few steps may go to domestic job workers, if they aren't a significant partGuidelines, para 5.1.3
MagnetsSegment D, since September 29, 2026: only rare earth permanent magnets that the Ministry of Heavy Industries' sintered magnet scheme doesn't coverClarification-3, opens in a new tab
Approvals75 applications for 23 products in 12 states by July 31, 2026, the government's figureAnswer 2296, opens in a new tab, August 7, 2026
A machine's red-tipped nozzle on a gantry above a panel of black circuit boards on an assembly line, with a tray of chips blurred in the foreground.
ECMS rates by segment and product (notification (e31d6fbd4044f8794f58157ba685e1ad, link 7 of 10), opens in a new tab, para 4 and Annexure A(II); Addendum-1, opens in a new tab)
Segment and productCumulative investmentTurnover-linked incentive, years 1 to 6Capex incentive
A: display module₹250 crore4%, 4%, 3%, 2%, 2%, 1%None
A: camera module₹250 crore5%, 4%, 4%, 3%, 2%, 2%None
B: passives that aren't surface-mount devices (non-SMD); electro-mechanicals₹50 crore8%, 7%, 7%, 6%, 5%, 4%None
B: multi-layer PCB₹50 crore6%, 6%, 5%, 5%, 4%, 4% up to 6 layers; 10%, 8%, 7%, 6%, 5%, 5% from 8 layersNone
B: lithium-ion cells for digital applications, not storage or mobility₹500 crore6%, 6%, 5%, 5%, 4%, 4%None
B: enclosures for phones, IT hardware and related devices₹500 crore7%, 6%, 5%, 4%, 4%, 3%None
C: high-density interconnect (HDI), modified semi-additive process (MSAP) or flexible PCB₹1,000 crore8%, 7%, 7%, 6%, 5%, 4%25%
C: SMD passives₹250 crore5%, 5%, 4%, 4%, 3%, 3%25%
D: supply chain parts; capital goods₹10 crore minimumNone25%
E: small form-factor pluggable (SFP) optical transceivers, added July 7, 2025₹50 crore5%, 4%, 4%, 3%, 2%, 2%None

The notification adds 1% for Indian-made laminate in multi-layer PCBs and 2% for Indian-made cathode active material in lithium-ion cells. Pages still giving ECMS ₹22,919 crore quote the outlay at notification.

What is the Mobile Phone Manufacturing Scheme?

The Mobile Phone Manufacturing Scheme (MPMS) is MeitY's incentive scheme for phones made in India, notified on August 21, 2026, with a ₹62,500 crore budget for 2026-27 to 2030-31. Target Segment 1 pays large phone makers, electronics manufacturing services (EMS) companies included, on sales growth. Target Segment 2 backs Indian brands.

Target Segment 1: incentivizing mobile phone manufacturing
ItemDetailSource
Who may applyA phone maker registered in India, EMS companies included, with a global turnover, group companies included, of ₹10,000 crore or more in 2025-26Notification (0cad9c3d9d9bb4361151638fcb2394c8, link 8 of 10), opens in a new tab, para 7.1; guidelines (Mobile phone makers can apply for incentives from October 15, 2026-10-06, link 4 of 5), opens in a new tab, para 3.1
Eligible salesThe brand's sales minus a baseline: its previous year's domestic sales plus 15%, so it movesPara 7.2
Existing brandSales above 2025-26 by ₹5,000 crore in 2026-27, rising ₹5,000 crore a year to ₹25,000 crore in 2030-31Para 7.1
New brandEligible after ₹10,000 crore of annual sales in India; then ₹5,000 crore more sales each yearPara 7.1
Rates2.75% falling to 2.25% on eligible sales up to the difference between the 2023-24 to 2025-26 average and the baseline; 5% falling to 4% on the restPara 7.3(a) and (b)
Domestic sourcingUp to 1.5% more: display and camera modules 0.30% each, enclosures 0.50%, batteries and USB cables 0.20% each, if localized for at least 25% of the year's unitsPara 7.3
Application fee₹10 lakh, paid online, not refundableGuidelines, para 14.8
Target Segment 2: supporting Indian mobile phone brands
ItemDetailSource
Who may applyPhone makers registered in India, EMS companies included, with ₹1,000 crore or more of turnover in 2025-26Notification (0cad9c3d9d9bb4361151638fcb2394c8, link 9 of 10), opens in a new tab, para 8.1
Indian brandIncorporated in India, intellectual property (IP) and trademark held in India, under the management control of Indian citizens, more than 51% held by Indian citizens, with in-house R&D and design in IndiaPara 8.1
Sales thresholdNonePara 8.1
Rates5% of eligible sales, plus 3% for Indian design and R&D, plus the domestic sourcing incentivePara 8.3

The 51% Indian shareholding test applies only to Indian brands in Target Segment 2, not to every applicant (MPMS notification, opens in a new tab, para 8.1).

Two outlay figures appear, and they measure different things. The notification's ₹62,500 crore budget includes administrative charges (para 4), while the guidelines' ₹62,300 crore is the incentive outlay for both segments (para 13.1).

The Target Segment 1 guidelines of October 6, 2026, opens in a new tab keep the window open from October 15, 2026 to March 31, 2029. An application filed after March 31, 2027 earns incentives only from its approval date (para 14.2). MeitY may extend or reopen the window on the scheme's performance and the industry's response (para 14.3). The guidelines say MeitY's website will carry the portal's details (para 15.1).

Our insight Mobile phone makers can apply for incentives from October 15 has the rest.

Can a foreign or land-border-linked company apply?

All three schemes name an applicant registered in India, so a foreign group applies through an Indian entity. PLI 2.0 takes any company, ECMS a company or LLP. MPMS Target Segment 2 serves Indian brands only, and Target Segment 1 puts an applicant or brand owned or controlled from a land-border country through the same checks as foreign direct investment.

The MPMS Target Segment 1 guidelines, opens in a new tab add a land-border check (para 3.2). It covers an applicant or brand owned or controlled, directly or indirectly, from a country that shares a land border with India. Such an application goes through the same compliance processes as foreign direct investment, on terms the government may specify.

The ECMS notification, guidelines and amendments read to October 31, 2026 say nothing on land-border ownership. The ECMS guidelines, opens in a new tab do ask an applicant with foreign direct investment (FDI) to comply with the FDI policy (para 3.1.4).

The investment rule itself is in Press Note 3: India's land-border investment rule in 2026. MeitY's other rules for foreign firms are in India's digital laws for foreign companies: what applies, and when.

How IndusDesk helps with scheme applications

We watch the authorities, tell you what each change means for your products and plans, represent you while a decision is still open, and carry the work through, with every step on record in your workspace.

Frequently asked questions

Can you combine ECMS with PLI or another incentive scheme?

Eligibility under ECMS doesn't affect eligibility under other schemes, but investment or sales already incentivized under another Government of India scheme can't count under ECMS (guidelines (30e8672a53f05b9f90d86d16901b23d2, link 5 of 5), opens in a new tab, para 5.1.5; notification (e31d6fbd4044f8794f58157ba685e1ad, link 10 of 10), opens in a new tab, para 11.4). The applicant gives a management undertaking on it. PLI 2.0 and the MPMS each say eligibility under them doesn't affect eligibility under any other scheme, and vice versa (PLI 2.0 notification, opens in a new tab, para 5.5; MPMS notification, opens in a new tab, para 9).

Does the government prefer Indian-made electronics in its purchases?

Yes: central buyers apply DPIIT's Public Procurement (Preference to Make in India) Order, 2017, which MeitY says exists "to prioritize domestically manufactured products in public procurement" (Rajya Sabha answer 2472, opens in a new tab, March 13, 2026). MeitY notified CCTV cameras under the order on March 6, 2024, with effect from June 7, 2024 (circular of February 4, 2026, opens in a new tab, para 1). Our guide Make in India procurement order: local content and bidding rules explains the order.

Will government buyers check that supplied electronics meet the regulations?

Government buyers must make sure supplies conform. MeitY's circular of December 3, 2025, opens in a new tab says goods bought under the Make in India order must meet every regulatory requirement that applies, telecom testing and quality control orders included (paras 1 and 2). Buyers may write third-party testing and penalty clauses into contracts, and are advised to tell the nodal ministry about non-compliant goods (para 3).