Ministry of Environment, Forest and Climate Change: waste rules and extended producer responsibility (EPR)
- 16 Gazette notices
- 61 CPCB notices
- 20 hazardous waste committee decisions and orders
- 1 HCFC quota orders
Updated
How the EPR and waste rules work, from registration to penalties: our MoEFCC guide.
Rules and drafts
- Draft Solid Waste Management Rules, 2024, with objections and suggestions invited within 60 days.
S.O. 5369(E) ·
Closing date March 25, 2025, as MoEFCC states
MoEFCC's What's New lists it for comment from December 26, 2024
Closing date February 12, 2025, worked out
60 days from December 14, 2024, the day S.O. 388(E) says copies were made public
Made final by S.O. 388(E) of January 27, 2026
- Draft Environment Protection (Extended Producer Responsibility for Packaging made from paper, glass and metal as well as sanitary products) Rules, 2024, with objections and suggestions invited within 60 days.
S.O. 5282(E) ·
Closing date March 17, 2025, as MoEFCC states
MoEFCC's What's New lists it for comment from December 18, 2024
Closing date February 4 or 7, 2025, worked out
60 days from the Gazette of December 6, 2024, put online December 9, 2024
- S.O. 5210(E) amends the Battery Waste Management Rules, 2022, with no draft published first (dispensed with in the public interest).
S.O. 5210(E) ·
- The E-Waste (Management) Second Amendment Rules, 2024 amend the E-Waste (Management) Rules, 2022, with no draft published first (dispensed with in the public interest), in force on publication.
G.S.R. 699(E) ·
- The Hazardous and Other Wastes (Management and Transboundary Movement) Second Amendment Rules, 2024 amend the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, with no draft published first (dispensed with in the public interest), in force on publication.
G.S.R. 698(E) ·
- Draft Liquid Waste Management Rules, 2024, with objections and suggestions invited within 60 days.
S.O. 4341(E) ·
Closing date December 6 or 7, 2024, worked out
60 days from the Gazette of October 7, 2024, put online October 8, 2024
- Draft Remediation of Contaminated Sites Rules, 2024, with objections and suggestions invited within 60 days.
S.O. 3550(E) ·
Closing date October 20, 2024, worked out
60 days from August 21, 2024, the day S.O. 3401(E) says copies were made public
Made final by S.O. 3401(E) of July 24, 2025
- Draft Hazardous and Other Wastes (Management and Transboundary Movement) Second Amendment Rules, 2024, bringing out "regulations for extended producer responsibility (EPR) for scrap of Non-Ferrous metals", amending the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, with objections and suggestions invited within 60 days.
G.S.R. 499(E) ·
Closing date December 17, 2024, as MoEFCC states
MoEFCC's What's New lists it for comment from September 18, 2024
Closing date October 13, 2024, worked out
60 days from August 14, 2024, the day G.S.R. 438(E) says copies were made public
Made final by G.S.R. 438(E) of July 1, 2025
- Draft Construction and Demolition Waste Management Rules, 2024, to replace the Construction and Demolition Waste Management Rules, 2016, with objections and suggestions invited within 60 days.
G.S.R. 458(E) ·
MoEFCC lists the same date for opening and closing, September 6, 2024
MoEFCC's What's New lists it for comment
Closing date September 28 or 29, 2024, worked out
60 days from the Gazette of July 30, 2024, put online July 31, 2024 (the draft does not say what the period counts from)
Made final by G.S.R. 219(E) of April 2, 2025
- The Battery Waste Management (Second Amendment) Rules, 2024 amend the Battery Waste Management Rules, 2022, in force on publication.
S.O. 2374(E) ·
- The Plastic Waste Management (Amendment) Rules, 2024 amend the Plastics Waste Management Rules, 2016, completing the draft G.S.R. 744(E) of October 16, 2023, in force on publication.
G.S.R. 201(E) ·
Completes the draft G.S.R. 744(E) of October 16, 2023; objections and suggestions received were considered
- The Battery Waste Management (Amendment) Rules, 2024 amend the Battery Waste Management Rules, 2022, in force on publication.
G.S.R. 190(E) ·
- The Hazardous and Other Wastes (Management and Transboundary Movement) Amendment Rules, 2024 amend the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, in force on publication except parts that start on April 1, 2024.
G.S.R. 177(E) ·
- The E-Waste (Management) Amendment Rules, 2024 amend the E-Waste (Management) Rules, 2022, with no draft published first (dispensed with in the public interest), in force on publication.
G.S.R. 164(E) ·
- Draft End-of-Life Vehicles (Management) Rules, 2024, bringing out "regulations for Extended Producer Responsibility (EPR) for End-of-Life Vehicles", with objections and suggestions invited within 60 days.
S.O. 367(E) ·
No closing date stated
MoEFCC's What's New lists it for comment from January 31, 2024
Closing date March 30, 2024, worked out
60 days from January 30, 2024, the day S.O. 98(E) says copies were made public
Made final by S.O. 98(E) of January 6, 2025
- S.O. 5(E) amends the "ash utilisation notification" (S.O. 5481(E) of December 31, 2021), with no draft published first (dispensed with in the public interest).
S.O. 5(E) ·
CPCB EPR notices
- CPCB show-cause notice to Registered producers, importers and brand owners for Annual Return Filing for FY 2022-24 in Compliance with PWM Rules, 2016 (as amended); reply to this notice due within 7 days of issue (worked out as January 6, 2025)., PDF, opens in a new tab
Listed
Reply to this notice: due January 6, 2025 (worked out: 7 days from the date on CPCB's list, December 30, 2024)
- CPCB guidance Manual for Producers., PDF, opens in a new tab
PDF date
- CPCB guidance Manual for Recyclers., PDF, opens in a new tab
PDF date
- CPCB guidance Manual for Refurbishers., PDF, opens in a new tab
PDF date
- CPCB instruction Sheet (plastic waste processor Sales)., PDF, opens in a new tab
PDF date
- CPCB guidance Document - SIMP., PDF, opens in a new tab
- CPCB show-cause notice to Registered producers, importers and brand owners for Annual Return filing for FY 2023-24 in compliance of PWM Rules, 2016 (as amended); EPR targets for FY 2023-24 due by November 30, 2024., PDF, opens in a new tab
EPR targets for FY 2023-24: due November 30, 2024
- MoEFCC extends the deadline for annual returns for FY 2023-24 under battery EPR to December 31, 2024., PDF, opens in a new tab
Annual returns for FY 2023-24: due December 31, 2024
- CPCB guidelines determination of processing capacity of Recycler., PDF, opens in a new tab
- CPCB guidance on the e-waste EPR portal: Manufacturer - Standard Operating Procedures (SOPs)., PDF, opens in a new tab
PDF date
- CPCB guidance on the e-waste EPR portal: Refurbisher - Standard Operating Procedures (SOPs)., PDF, opens in a new tab
PDF date
- CPCB guidance on the e-waste EPR portal: Recycler - Standard Operating Procedures (SOPs)., PDF, opens in a new tab
(month only printed)
- CPCB guidance on the e-waste EPR portal: Environmental Compensation Guidelines under E-Waste (Management) Rules, 2022 and amendment thereof., PDF, opens in a new tab
- CPCB notice and Environment Compensation Guidelines under Hazardous and Other Wastes (M&TM) Amendments Rules, 2022 and Amendments thereof., PDF, opens in a new tab
- CPCB guidance on the battery EPR portal: Guidelines for imposition of Environment compensation under Battery Waste Management Rules, 2022., PDF, opens in a new tab
(day handwritten)
- CPCB guidance on the waste tire EPR portal: FAQ., PDF, opens in a new tab
PDF date
- CPCB show-cause notice to producers, importers and brand owners for shortfall in annual return filing FY 2022-23; compliance with the direction due by September 1, 2024., PDF, opens in a new tab
Compliance with the direction: due September 1, 2024
- CPCB show-cause notice to producers, importers and brand owners not filing annual return FY 2022-23; compliance with the direction due by September 1, 2024., PDF, opens in a new tab
Compliance with the direction: due September 1, 2024
- CPCB show-cause notice to plastic waste processors not filing annual return FY 2022-23; compliance with the direction due by September 1, 2024., PDF, opens in a new tab
Compliance with the direction: due September 1, 2024
- Direction issued to Ms. Enviro Recyclean by Karnataka state pollution control board., PDF, opens in a new tab
Listed
- CPCB notice regarding No response received from producers, importers and brand owners/plastic waste processors on Changes Observed in Login Credentials; reply to this notice due within 7 days of issue (worked out as July 22, 2024)., PDF, opens in a new tab
Reply to this notice: due July 22, 2024 (worked out: 7 days from the date printed on the notice, July 15, 2024)
- CPCB guidance on the battery EPR portal: SOP for EPR Certificate generation and EPR Targets., PDF, opens in a new tab
PDF date
- CPCB letter on the used oil EPR portal: Go-Live of EPR Portal for Used Oil Management on CPCB website for Sign-up and Registration; registration on the EPR portal due by July 31, 2024., PDF, opens in a new tab
Registration on the EPR portal: due July 31, 2024
- CPCB letter on the used oil EPR portal: Regarding Launch of EPR portal for Used Oil Management and clearing of consignments related to import of Base oil or Lubrication oil., PDF, opens in a new tab
- CPCB extends the deadline for annual returns for FY 2023-24 under plastic packaging EPR to September 30, 2024 (it was June 30, 2024)., PDF, opens in a new tab
Annual returns for FY 2023-24: due September 30, 2024, moved from June 30, 2024
- CPCB extends the deadline for annual and quarterly returns for FY 2023-24 under e-waste EPR to August 31, 2024 (it was June 30, 2024)., PDF, opens in a new tab
Annual and quarterly returns for FY 2023-24: due August 31, 2024, moved from June 30, 2024
- CPCB extends the deadline for registration on the EPR portal under plastic packaging EPR to June 30, 2024 (it was May 31, 2024)., PDF, opens in a new tab
Registration on the EPR portal: due June 30, 2024, moved from May 31, 2024
- CPCB extends the deadline for annual returns for FY 2022-23 under plastic packaging EPR to June 30, 2024 (it was May 31, 2024)., PDF, opens in a new tab
Annual returns for FY 2022-23: due June 30, 2024, moved from May 31, 2024
- CPCB guidance on the used oil EPR portal: FAQs., PDF, opens in a new tab
PDF date
- Directions issued to Ms. Shakti Plastic Industries by Maharashtra state pollution control board., PDF, opens in a new tab
- CPCB instruction Sheet for Profile Amendment., PDF, opens in a new tab
PDF date
- CPCB instruction Sheet of Annual Return for Recycler., PDF, opens in a new tab
PDF date
- CPCB instruction Sheet of Annual Return for Producer., PDF, opens in a new tab
PDF date
- CPCB guidance on the used oil EPR portal: SoP for Producer Registration., PDF, opens in a new tab
(month only printed)
- CPCB guidance document for generation and transfer of EPR Certificate., PDF, opens in a new tab (Guidance document for E Waste generation and transfer of EPR Certificate Final (1))
PDF date
- CPCB notice regarding labeling Requirements and Recycled Material., PDF, opens in a new tab
- CPCB extends the deadline for registration on the EPR portal under plastic packaging EPR to May 31, 2024 (it was March 31, 2024)., PDF, opens in a new tab
Registration on the EPR portal: due May 31, 2024, moved from March 31, 2024
- CPCB extends the deadline for annual returns for FY 2022-23 under plastic packaging EPR to May 31, 2024 (it was March 31, 2024)., PDF, opens in a new tab
Annual returns for FY 2022-23: due May 31, 2024, moved from March 31, 2024
- CPCB letter on the plastic packaging EPR portal: Registration of Importers as per provision of Plastic Waste Management (PWM) Rules, 2016, as amended., PDF, opens in a new tab
- CPCB letter issued to customs for release of consignments of producers under E-Waste (M) Rules, 2022; imported consignments may be released until June 30, 2024., PDF, opens in a new tab
Release of imported consignments: due June 30, 2024
Registration on the EPR portal: due June 30, 2024
- Minutes from Fourth Meeting of EPR Appraisal Committee held on May 9, 2024 at 4 PM., PDF, opens in a new tab
File date
- CPCB guidance Manuals: Edit Sales Data & Account Unblock., PDF, opens in a new tab
(month only printed)
- CPCB sets June 30, 2024 as the deadline for EPR targets and annual returns for FY 2022-23 and FY 2023-24 under battery EPR., PDF, opens in a new tab
EPR targets and annual returns for FY 2022-23 and FY 2023-24: due June 30, 2024
- CPCB notice for Transaction of EPR credits by the Producers., PDF, opens in a new tab
- CPCB letter on the used oil EPR portal: Letter regarding clearing of consignments related to import of base oil or lubrication oil., PDF, opens in a new tab
- CPCB notice to Registered Recyclers on the E-Waste EPR Portal Under E-Waste; generation of EPR certificates for FY 2023-24 due by April 30, 2024., PDF, opens in a new tab
Generation of EPR certificates for FY 2023-24: due April 30, 2024
- Show-cause notice dated April 8, 2024 issued to M/s Shakti Plastic Industries for Closure under Water (P & CP) Act, 1974, Air (P & CP) Act, 1981 on PWM Rules by MPCB., PDF, opens in a new tab
- CPCB guidance on the plastic packaging EPR portal: How to create a ticket?., PDF, opens in a new tab
PDF date
- CPCB guidance on the battery EPR portal: How To Create A Ticket?., PDF, opens in a new tab
PDF date
- CPCB guidance on the waste tire EPR portal: How to Create a Ticket?., PDF, opens in a new tab
PDF date
- Action taken report received from Maharashtra state pollution control board on direction issued by CPCB dated October 26, 2023 (Part 1)., PDF, opens in a new tab
- CPCB guidance Document for Generation and Transfer of EPR Certificate., PDF, opens in a new tab (Guidance Document for Generation and Transfer of EPR Certificate for wastetyremanagement)
PDF date
- CPCB notice on the waste tire EPR portal: All registered Recyclers are hereby directed to generate EPR certificates against the Waste Tires recycled., PDF, opens in a new tab
- CPCB notice on the waste tire EPR portal: Producers are hereby directed to fulfill their assigned EPR obligations for F.Y. 2022-23 & F.Y. 2023-24 and also submit their Quarterly & Annual returns through the Waste Tire EPR Portal., PDF, opens in a new tab
- CPCB notice on the e-waste EPR portal: All registered Recyclers are hereby directed to recycle the E-Waste available with them and generate the EPR Certificates for subsequent sale to producers., PDF, opens in a new tab
- CPCB notice on the e-waste EPR portal: All Producers are hereby directed to fulfill their assigned EPR obligations for the financial year 2023-24 by March 31, 2024., PDF, opens in a new tab
EPR targets for FY 2023-24: due March 31, 2024
- CPCB guidance on the e-waste EPR portal: FAQ under E-Waste (Management) Rules, 2022., PDF, opens in a new tab
- CPCB extends the deadline for annual returns for FY 2022-23 under plastic packaging EPR to January 31, 2024., PDF, opens in a new tab
Annual returns for FY 2022-23: due January 31, 2024
- Action taken report received from Gujarat state pollution control board on direction issued by CPCB., PDF, opens in a new tab
PDF date
- CPCB show-cause notice to unregistered producers, importers and brand owners working without obtaining EPR registration; reply to this notice due within 10 days of issue (worked out as January 25, 2024)., PDF, opens in a new tab
Reply to this notice: due January 25, 2024 (worked out: 10 days from the date printed on the notice, January 15, 2024)
- CPCB extends the deadline for generation of EPR certificates for FY 2022-23 under plastic packaging EPR to January 31, 2024., PDF, opens in a new tab
Listed
Generation of EPR certificates for FY 2022-23: due January 31, 2024
Hazardous waste committee decisions and orders
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 140th meeting of the Expert Committee held on December 20, 2024., PDF, opens in a new tab
Expert Committee, 140th meeting · Held December 20, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 90th meeting of the Technical Review Committee held on December 20, 2024., PDF, opens in a new tab
Technical Review Committee, 90th meeting · Held December 20, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 139th meeting of the Expert Committee held on November 29, 2024., PDF, opens in a new tab
Expert Committee, 139th meeting · Held November 29, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 138th meeting of the Expert Committee held on October 23, 2024., PDF, opens in a new tab
Expert Committee, 138th meeting · Held October 23, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 89th meeting of the Technical Review Committee held on October 23, 2024., PDF, opens in a new tab
Technical Review Committee, 89th meeting · Held October 23, 2024
- MoEFCC's office memorandum of October 15, 2024, on its page for importing and exporting hazardous and other wastes: Revised List of High End and High Value used/refurbished Medical Equipment other than critical care medical equipment., PDF, opens in a new tab
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 137th meeting of the Expert Committee held on September 27, 2024., PDF, opens in a new tab
Expert Committee, 137th meeting · Held September 27, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 136th meeting of the Expert Committee held on August 20, 2024., PDF, opens in a new tab
Expert Committee, 136th meeting · Held August 20, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 88th meeting of the Technical Review Committee held on August 20, 2024., PDF, opens in a new tab
Technical Review Committee, 88th meeting · Held August 20, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 135th meeting of the Expert Committee held on July 30, 2024., PDF, opens in a new tab
Expert Committee, 135th meeting · Held July 30, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 134th meeting of the Expert Committee held on June 19, 2024., PDF, opens in a new tab
Expert Committee, 134th meeting · Held June 19, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 87th meeting of the Technical Review Committee held on May 20, 2024., PDF, opens in a new tab
Technical Review Committee, 87th meeting · Held May 20, 2024
- MoEFCC's application checklist of May 15, 2024, on its page for importing and exporting hazardous and other wastes: Checklist for import/export of hazardous and other wastes., PDF, opens in a new tab
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 133rd meeting of the Expert Committee held on May 14, 2024., PDF, opens in a new tab
Expert Committee, 133rd meeting · Held May 14, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 132nd meeting of the Expert Committee held on April 3, 2024., PDF, opens in a new tab
Expert Committee, 132nd meeting · Held April 3, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 86th meeting of the Technical Review Committee held on April 3, 2024., PDF, opens in a new tab
Technical Review Committee, 86th meeting · Held April 3, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 131st meeting of the Expert Committee held on March 12, 2024., PDF, opens in a new tab
Expert Committee, 131st meeting · Held March 12, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 85th meeting of the Technical Review Committee held on March 12, 2024., PDF, opens in a new tab
Technical Review Committee, 85th meeting · Held March 12, 2024
- MoEFCC's decisions on applications to import or export hazardous and other wastes, taken on the basis of the 130th meeting of the Expert Committee held on February 7, 2024., PDF, opens in a new tab
Expert Committee, 130th meeting · Held February 7, 2024
- MoEFCC's decisions on issues and clarifications raised under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, taken on the basis of the 84th meeting of the Technical Review Committee held on February 7, 2024., PDF, opens in a new tab
Technical Review Committee, 84th meeting · Held February 7, 2024